AMJAD BASHIR & CONTRACTORS

Main Kulgam ,near Mini secretrait,and DIC office
alamjadibnibashir@gmail.com
Main Kulgam ,near Mini secretrait,and DIC office
Call StoreSend Whatsapp
All
Architect & Engineering services
Shuttering service
construction
2.Drawings & 3D
2.Drawings & 3D
30000
3. Drawings & 3D
3. Drawings & 3D
50000
3.Drawings & 3D
3.Drawings & 3D
30000
Cubic Feet'
Cubic Feet'
140
Drawings & 3D
Drawings & 3D
30000
EXCAVATION AND BACK FILLING
EXCAVATION AND BACK FILLING
0
Plinth Area
Plinth Area
1250
Quantity of concrete for column ( grade ( M-20)
Quantity of concrete for column ( grade ( M-20)
0
SHUTTERING COSTS(PLINTH AREA CONTRACT)
SHUTTERING COSTS(PLINTH AREA CONTRACT)
0
per Sqf
SLM_ 4000
SLM_ 4000
1
Shuttering Service
Shuttering Service
0
Slab Area
Slab Area
200
Slab Area Contract
Slab Area Contract
1583.33
per Sqf
Slab Area SFT'
Slab Area SFT'
200
Square FT' (4")
Square FT' (4")
50
Steel Fe 550 (10MM)
Steel Fe 550 (10MM)
0
per Qtl
Steel Fe 550 (12MM)
Steel Fe 550 (12MM)
0
per Qtl
Steel Fe 550 (16MM)
Steel Fe 550 (16MM)
0
per Qtl
Steel Fe 550 (20MM)
Steel Fe 550 (20MM)
0
per Qtl
Steel Fe 550 (8MM)
Steel Fe 550 (8MM)
0
per Qtl
THERMO MECHANICALLY TREATED BARS OF Grade FE-550D should be used for foundation and ground floor
THERMO MECHANICALLY TREATED BARS OF Grade FE-550D should be used for foundation and ground floor
0
THERMO MECHANICALLY TRWEATED BARS SHOULD BE USED FOR WHOLE STRUCTURE
THERMO MECHANICALLY TRWEATED BARS SHOULD BE USED FOR WHOLE STRUCTURE
0
per Qtl
TOTAL QUANTITY OF CONCRETE FOR (G+1)
TOTAL QUANTITY OF CONCRETE FOR (G+1)
0
per M3
TOTAL SLAB AREA
TOTAL SLAB AREA
165
per Sqf
Total quantity of concrete for slab and beam casting without shuttering and centering with specified Grade (m -20)
Total quantity of concrete for slab and beam casting without shuttering and centering with specified Grade (m -20)
0
bricks
bricks
0
complete building cost
complete building cost
1000000
concrete pump
concrete pump
1
engineering services
engineering services
0
plinth area contract
plinth area contract
165
quantity of concrete upto plith level (grade (M-20)
quantity of concrete upto plith level (grade (M-20)
0
per M3
rcc work
rcc work
0
reinforcement work
reinforcement work
0
shUTTERING CONTRACT FOR gROUND FLOOR
shUTTERING CONTRACT FOR gROUND FLOOR
0
per Sqf